<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Control-Systems on Leandro&#39;s Code Cave</title>
    <link>https://iamleandrooooo.github.io/tags/control-systems/</link>
    <description>Recent content in Control-Systems on Leandro&#39;s Code Cave</description>
    <generator>Hugo</generator>
    <language>en-us</language>
    <lastBuildDate>Thu, 29 Oct 2026 00:00:00 +0000</lastBuildDate>
    <atom:link href="https://iamleandrooooo.github.io/tags/control-systems/index.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>Waterworks - Keeping a Game Boy Treatment Plant Alive for 60 Seconds</title>
      <link>https://iamleandrooooo.github.io/posts/waterworks-full-shift/</link>
      <pubDate>Thu, 29 Oct 2026 00:00:00 +0000</pubDate>
      <guid>https://iamleandrooooo.github.io/posts/waterworks-full-shift/</guid>
      <description>Challenge Description Category: Reverse Engineering / Industrial Control&#xA;Difficulty: 🔴 Hard&#xA;The cartridge simulates a Clearwater tank-farm shift. Pump P-101 fills the break tank, FCV-2 supplies the distribution network, and demand changes throughout the shift. Complete 60 seconds without tripping the plant and submit the operator token.&#xA;The attachment is the same 32 KiB waterworks.gb cartridge used by the other Clearwater training-rig challenges. This time the task looks less like reversing and more like playing a tiny process-control game.</description>
    </item>
  </channel>
</rss>
